EV charging: wallbox and reinforced socket
Before choosing a charger, we check what the installation can support: contracted power, switchboard, protection and cable routes.
Service data
- Scope
- Design and installation
- Equipment
- Wallbox (mode 3) and Legrand Green'Up reinforced socket
- Sites
- Private garages and condominiums
- Checks
- Power, switchboard, protection, cabling
- Load management
- Balanced against the building's consumption
- Area
- Samora Correia and about 50 km around it: Ribatejo, Lisbon and the Setúbal peninsula
03Drawings
EV charging with dynamic load management: schematic
Illustrative example. Not a real project.
Drawing labels stay in Portuguese, as on the original document.
View drawingFitting an EV charger at home is, first of all, a decision about the electrical installation: how much power is available, where the cable can run, what protection is missing from the switchboard. The charger is chosen after that. We assess, size and install the wallbox or socket, in private garages and in condominiums.
Wallbox or reinforced socket
Reinforced socket (tomada reforçada). A socket made for charging, used with the cable that comes with the vehicle. We fit the Legrand Green'Up, which the manufacturer rates for charging at up to 3.7 kW (16 A, single-phase); the actual power depends on the vehicle's cable. It suits low daily mileage or a full night available for charging.
Wallbox. A fixed charging station with a Type 2 connection, which communicates with the vehicle and regulates the current: this is what is called mode 3. On single-phase it reaches 7.4 kW (32 A); on three-phase, 11 kW (16 A) or 22 kW (32 A). The vehicle's on-board charger also limits the power, so we check it before sizing.
In either case the Portuguese wiring rules ask for a dedicated circuit, for the vehicle only, with its own overcurrent protection and its own 30 mA residual-current protection. The residual-current device must be at least type A; for charging stations with a Type 2 connection, DGEG's technical guide also asks for detection of DC fault currents, by a type B device or by an associated detector. It is a point to check in any quotation.
Contracted power, single-phase and three-phase
The charger adds to the rest of the house. A single-phase wallbox at 32 A draws 7.4 kW: on its own it exceeds a contracted power (potência contratada) of 6.9 kVA. There are three answers, often combined: limit the charging current to a value the installation can carry; raise the contracted power, which above 10.35 kVA is only possible on three-phase; or install load management. A higher contracted power is paid for on every bill, whether you use it or not.
What load management does
Load management, also called load balancing (in Portuguese, balanceamento de carga or controlo dinâmico de potência), continuously measures the total consumption of the home and adjusts the charger's current so that the sum stays under the set limit. When the oven comes on, the car charges more slowly; when it goes off, charging picks up again. This is what allows charging without raising the contracted power, when the home's consumption leaves headroom.
In buildings with several charging points, DGEG's technical guide provides for a load control system that shares out the available power.
Charging in a condominium
The electric mobility regime (Decreto-Lei 93/2025, article 23) allows any unit owner to install, at their own expense, a charging point in the parking area of an existing building. DGEG's frequently asked questions (in Portuguese) clarify that the same applies to tenants and legal occupiers. Where the installation is in, or passes through, a common part of the building, the law requires prior written notice to the condominium administration, at least 30 days in advance. The administration may object only in the cases the law lists, for example if the building already has, or installs within 90 days, a shared charging point that meets the same needs, or if the installation is shown to put people or property at risk.
On the technical side, the question is where the energy comes from. DGEG's technical guide allows three sources: the main switchboard of your own flat, the building's riser board with a separate meter, or the common services board, an option the guide recommends only when the others are not feasible. The notice to the condominium is yours to send. We prepare the technical part: where the supply comes from, where the cables run, what protection is fitted.
What to have ready
- The make and model of the vehicle, or of the one you plan to buy.
- Photographs of the switchboard and of the parking space, and the approximate distance between the two.
- The contracted power, which is on your electricity bill.
- In a condominium: whether the space is a closed box, a marked space or a common part for your exclusive use, and where the building's switchboards are.
How it goes and what you are left with
As a rule, we begin by assessing the existing installation, from photographs or on site. A proposal follows, with the equipment identified, the cable route and the changes to the switchboard.
At the end you have a dedicated, labelled circuit in the switchboard, a charger tested and set to the agreed current, and the execution document: the declaration of conformity of execution or the execution responsibility statement (termo de responsabilidade pela execução). Services are delivered by technicians accredited by DGEG.
Frequently asked questions
Can I install a charger in my parking space in an apartment building?
Article 23 of Decreto-Lei 93/2025 allows any unit owner (condómino) to install, at their own expense, a charging point in the parking area of an existing building. If the installation is in, or passes through, a common part of the building, written notice must be given to the condominium administration at least 30 days in advance. The administration may object only in the cases listed in the law.
Do I need to increase my contracted power for a wallbox?
Not always. It depends on the charger's power, on what the home draws at the same time and on whether there is load management. DGEG's technical guide gives an example: charging at 3,680 VA (16 A) needs at least the 4.6 kVA level. We do the sums with your consumption before recommending anything.
Reinforced socket or wallbox: which should I choose?
A reinforced socket charges at lower power (the Legrand Green'Up at up to 3.7 kW, according to the manufacturer) and suits low daily mileage or overnight charging. A wallbox charges faster, regulates the current and accepts load management. The choice depends on the vehicle, your journeys and the installation.
What is load balancing?
A system that measures the total consumption of the home and adjusts the charger's current so that the sum stays under a set limit. In Portugal you will also see it called gestão de carga, balanceamento de carga or controlo dinâmico de potência. It lets you charge without raising the contracted power when the home's consumption leaves headroom.
Do I need three-phase to charge a car at home?
Not necessarily. On single-phase, a wallbox reaches 7.4 kW (32 A). Three-phase allows 11 kW or 22 kW, if the vehicle accepts it and the installation is three-phase.
Who is allowed to install a charging point in Portugal?
DGEG states that the installation should only be carried out by an installation company for private electrical installations (entidade instaladora) or by technicians responsible for execution who are registered with DGEG. At the end, a declaration of conformity of execution or an execution responsibility statement is issued.